NVIDIA GB300 - United States
US-GB300-NVL72POC 10 to 12 weeks after signing
- Location
- United States
- Availability
- POC 10 to 12 weeks after signing
- Cooling
- DLC liquid cooling
- Reference price
- $5.30 USD / hr / GPU, starting price - Monthly
Full Specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA GB300
- GPU configuration
- 3,600 units4x GB300 per compute tray900 trays72 GPU per rack (NVL72)
- Deployment scale
- 50 NVL72 racks3,600 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Total cluster memory
- about 1,037TB total
HOSTHost
- Processor
- 2x NVIDIA Grace (72-core Arm Neoverse V2) per tray
- System memory
- LPDDR5X SOCAMM
- Storage
- OS 2x 1.92TB M.2Data 4x 3.84TB E1.S
NETWORKNetwork
- GPU interconnect
- InfiniBand XDR 800G per GPUConnectX-8Quantum-X800 two-tier non-blocking fat tree
- External network
- 1x BlueField-3 DPU (dual-port 400G) per tray
FACILITYSite and Delivery
- Location
- United States
- Cooling
- DLC liquid cooling
- Availability
- POC 10 to 12 weeks after signing
WORKLOADSuitable Workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16
From Signing to Go-Live
- 01Signing5 year term
- 02POCPOC 10 to 12 weeks after signing
- 03HandoverConfirmed with quote
- 04Go-liveConfirmed with quote
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
United States
- Region
- North America
- Country / city
- United States
- Site code
- US-GB300-NVL72
- Sites in the same location
- US-B300
Location is indicative, at country or city level.
Sites With NVIDIA GB300
Compare scale, network, cooling, and delivery time side by side.
This is currently the only site with NVIDIA GB300. Other GPU models are listed below for comparison.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| US-GB300-NVL72United StatesThis page | 50 NVL72 racks 3,600 GPU | 288GB per GPU about 1,037TB total | InfiniBand XDR 800G | DLC liquid cooling | POC 10 to 12 weeks after signing | $5.30 from |
| TW-H100Taiwan New Taipei - NVIDIA H100 | 3 nodes 24 GPU | 80GB per GPU 1.92TB total | Optional 400G | Air Cooling | In stock, immediate delivery 7 to 14 days after the 3rd unit is signed | $2.70 from |
| JP-Chiba-H100Japan Chiba - NVIDIA H100 | 4 nodes 32 GPU | 80GB per GPU 640GB per node | 400G Ethernet | Air Cooling | Delivery within 6 weeks of signing | $2.21 from |
| CZ-H200-NVLCzechia - NVIDIA H200 | 12 nodes 96 GPU | 141GB per GPU 1,128GB per node | 400G ConnectX-8 | Air Cooling | Live in December 2026 Expandable to 24 nodes | $2.75 from |
| CZ-B300-200Czechia - NVIDIA B300 | 25 nodes 200 GPU | 288GB per GPU about 57.6TB total | On request | To be confirmed | 16 weeks after signing | $4.80 from |
| IN-B300India - NVIDIA B300 | 8 to 256 nodes Configurable | 288GB per GPU 2.3TB per node | InfiniBand NDR 400G | Air Cooling | 8 to 10 weeks after signing | $4.86 from |
| US-B300United States - NVIDIA B300 | 8 to 96 nodes First batch 512 GPU | 288GB per GPU about 147TB total in first batch | InfiniBand NDR 400G | Air Cooling | 10 to 14 weeks after signing | $4.96 from |
| FI-B300Finland - NVIDIA B300 | 144 nodes 1,152 GPU | 288GB per GPU 2.3TB per node | 800G ConnectX-8 | DLC liquid cooling | About 22 weeks after signing | $5.30 from |
| KR-B300South Korea - NVIDIA B300 | 8 nodes 64 GPU | 288GB per GPU about 18.4TB total | 800G RoCEv2 | DLC liquid cooling | Live in December 2026 | Contact for pricing |
| US-IOWA-B300United States Iowa - NVIDIA B300 | 44 nodes 352 GPU | 288GB per GPU about 101.4TB total | 800G ConnectX-8 | Air Cooling | Live in mid-February 2027 | Contact for pricing |
| US-SEA-B300-32United States Seattle - NVIDIA B300 | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G ConnectX-8 | Air Cooling | Live in February 2027 | Contact for pricing |
| US-SEA-B300-64United States Seattle - NVIDIA B300 | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G ConnectX-8 | Air Cooling | Live in mid-March 2027 | Contact for pricing |
Comparable Alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to Site SearchNVIDIA B300 - United States
8 to 96 nodes · First batch 512 GPU
10 to 14 weeks after signing$4.96 USD / hr / GPU, starting price
NVIDIA B300 - United States Iowa
44 nodes · 352 GPU
Live in mid-February 2027Contact for pricing
NVIDIA B300 - United States Seattle
32 nodes · 256 GPU
Live in February 2027Contact for pricing
Common Questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Plan the Next Stage of Compute Together
Where Efficiency Leads.
Where AI Defines the Future.