NVIDIA B300 - United States Seattle
US-SEA-B300-32Live in February 2027
- Location
- United States Seattle
- Availability
- Live in February 2027
- Cooling
- Air Cooling
- Reference price
- Contact for pricing
Full Specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA B300
- GPU configuration
- 32 nodes8x B300 SXM per node
- Deployment scale
- 32 nodes256 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Memory per node
- 2.3TB per node
- Total cluster memory
- about 73.7TB total
HOSTHost
- Processor
- 2x Intel Xeon 6 (128 cores in total) per node
- System memory
- 2TB DDR5 ECC RDIMM per node
- Storage
- OS 1x 960GBData 4x 3.84TB NVMe Gen5
NETWORKNetwork
- GPU interconnect
- 800G ConnectX-8 SuperNIC8 ports per server (GPU:NIC 1:1, rail-optimized)
- External network
- 2x 200GbE BlueField-3 DPU per node
FACILITYSite and Delivery
- Location
- United States Seattle
- Cooling
- Air Cooling
- Availability
- Live in February 2027
WORKLOADSuitable Workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16
From Signing to Go-Live
- 01Signing5 year term
- 02HandoverConfirmed with quote
- 03Go-liveLive in February 2027
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
United States Seattle
- Region
- North America
- Country / city
- United States Seattle
- Site code
- US-SEA-B300-32
- Sites in the same location
- US-SEA-B300-64
Location is indicative, at country or city level.
Sites With NVIDIA B300
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| US-SEA-B300-32United States SeattleThis page | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G ConnectX-8 | Air Cooling | Live in February 2027 | Contact for pricing |
| CZ-B300-200Czechia | 25 nodes 200 GPU | 288GB per GPU about 57.6TB total | On request | To be confirmed | 16 weeks after signing | $4.80 from |
| IN-B300India | 8 to 256 nodes Configurable | 288GB per GPU 2.3TB per node | InfiniBand NDR 400G | Air Cooling | 8 to 10 weeks after signing | $4.86 from |
| US-B300United States | 8 to 96 nodes First batch 512 GPU | 288GB per GPU about 147TB total in first batch | InfiniBand NDR 400G | Air Cooling | 10 to 14 weeks after signing | $4.96 from |
| FI-B300Finland | 144 nodes 1,152 GPU | 288GB per GPU 2.3TB per node | 800G ConnectX-8 | DLC liquid cooling | About 22 weeks after signing | $5.30 from |
| KR-B300South Korea | 8 nodes 64 GPU | 288GB per GPU about 18.4TB total | 800G RoCEv2 | DLC liquid cooling | Live in December 2026 | Contact for pricing |
| US-IOWA-B300United States Iowa | 44 nodes 352 GPU | 288GB per GPU about 101.4TB total | 800G ConnectX-8 | Air Cooling | Live in mid-February 2027 | Contact for pricing |
| US-SEA-B300-64United States Seattle | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G ConnectX-8 | Air Cooling | Live in mid-March 2027 | Contact for pricing |
Comparable Alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to Site SearchNVIDIA B300 - United States Seattle
64 nodes · 512 GPU
Live in mid-March 2027Contact for pricing
NVIDIA B300 - United States
8 to 96 nodes · First batch 512 GPU
10 to 14 weeks after signing$4.96 USD / hr / GPU, starting price
NVIDIA B300 - United States Iowa
44 nodes · 352 GPU
Live in mid-February 2027Contact for pricing
Common Questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Plan the Next Stage of Compute Together
Where Efficiency Leads.
Where AI Defines the Future.