AIDC site | Europe - Finland

NVIDIA B300 - Finland

FI-B300About 22 weeks after signing

Location
Finland
Availability
About 22 weeks after signing
Cooling
DLC liquid cooling
Reference price
$5.30 USD / hr / GPU, starting price - Monthly
144Nodes
1,152GPU
288GB HBM3e per GPUMemory per GPU
800G ConnectX-8GPU Fabric
Specifications

Full Specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA B300
GPU configuration
1,152 units8x B300 per nodeNVLink 1,800 GB/s+
Deployment scale
144 nodes1,152 GPU
Memory per GPU
288GB HBM3e per GPU
Memory per node
2.3TB per node

HOSTHost

Processor
2x Intel Xeon 6700 or AMD EPYC 96xx per node
System memory
2TB+ DDR5 per node
Storage
NVMe RAID2x OS drives

NETWORKNetwork

GPU interconnect
ConnectX-8 800G

FACILITYSite and Delivery

Location
Finland
Cooling
DLC liquid cooling
Availability
About 22 weeks after signing

WORKLOADSuitable Workloads

Purpose
AI TrainingInferenceHPC

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16

Delivery schedule

From Signing to Go-Live

  1. 01Signing3/4/5 year term
  2. 02HandoverAbout 22 weeks after signing
  3. 03Go-liveConfirmed with quote

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Finland

Finland
Region
Europe
Country / city
Finland
Site code
FI-B300

Location is indicative, at country or city level.

Compare | Other sites

Sites With NVIDIA B300

Compare scale, network, cooling, and delivery time side by side.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
FI-B300FinlandThis page144 nodes
1,152 GPU
288GB per GPU
2.3TB per node
800G ConnectX-8DLC liquid coolingAbout 22 weeks after signing$5.30 from
CZ-B300-200Czechia25 nodes
200 GPU
288GB per GPU
about 57.6TB total
On requestTo be confirmed16 weeks after signing$4.80 from
IN-B300India8 to 256 nodes
Configurable
288GB per GPU
2.3TB per node
InfiniBand NDR 400GAir Cooling8 to 10 weeks after signing$4.86 from
US-B300United States8 to 96 nodes
First batch 512 GPU
288GB per GPU
about 147TB total in first batch
InfiniBand NDR 400GAir Cooling10 to 14 weeks after signing$4.96 from
KR-B300South Korea8 nodes
64 GPU
288GB per GPU
about 18.4TB total
800G RoCEv2DLC liquid coolingLive in December 2026Contact for pricing
US-IOWA-B300United States Iowa44 nodes
352 GPU
288GB per GPU
about 101.4TB total
800G ConnectX-8Air CoolingLive in mid-February 2027Contact for pricing
US-SEA-B300-32United States Seattle32 nodes
256 GPU
288GB per GPU
about 73.7TB total
800G ConnectX-8Air CoolingLive in February 2027Contact for pricing
US-SEA-B300-64United States Seattle64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G ConnectX-8Air CoolingLive in mid-March 2027Contact for pricing
FAQ | Common questions

Common Questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?