KONST
AI Training CalculatorContact Us
EN
AIDC site | Europe - Czechia

NVIDIA H200 - Czechia

CZ-H200-NVLLive in December 2026

Location
Czechia
Availability
Live in December 2026Expandable to 24 nodes
Cooling
Air Cooling
Reference price
$2.75 USD / hr / GPU, starting price - Monthly
12Nodes
96GPU
141GB HBM3e per GPUMemory per GPUAbout 13.5TB total
400G ConnectX-8GPU Fabric
Specifications

Full Specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA H200
GPU configuration
96 units8x NVIDIA H200 NVL PCIe per nodeExpandable to 24 nodes (192 units)
Deployment scale
12 nodes96 GPU
Memory per GPU
141GB HBM3e per GPU
Memory per node
1,128GB per node
Total cluster memory
About 13.5TB total

HOSTHost

Processor
2x AMD EPYC 9755 (128C/256T, 2.7 GHz) per node
System memory
2,304GB DDR5-6400 per node
Storage
OS 2x 480GB NVMe RAID1Data 3x 7.68TB NVMe Gen5 per node

NETWORKNetwork

GPU interconnect
8x NVIDIA ConnectX-8 400G per node (GPU:NIC 1:1)
External network
2x 25GbE

FACILITYSite and Delivery

Location
Czechia
Cooling
Air Cooling
Availability
Live in December 2026Expandable to 24 nodes

WORKLOADSuitable Workloads

Purpose
AI TrainingInferenceHPC

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16

Delivery schedule

From Signing to Go-Live

  1. 01Signing2/3 year term
  2. 02HandoverConfirmed with quote
  3. 03Go-liveLive in December 2026Expandable to 24 nodes

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Czechia

Czechia
Region
Europe
Country / city
Czechia
Site code
CZ-H200-NVL
Sites in the same location
CZ-B300-200

Location is indicative, at country or city level.

Compare | Other sites

Sites With NVIDIA H200

Compare scale, network, cooling, and delivery time side by side.

This is currently the only site with NVIDIA H200. Other GPU models are listed below for comparison.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
CZ-H200-NVLCzechiaThis page12 nodes
96 GPU
141GB per GPU
1,128GB per node
400G ConnectX-8Air CoolingLive in December 2026
Expandable to 24 nodes
$2.75 from
TW-H100Taiwan New Taipei - NVIDIA H1003 nodes
24 GPU
80GB per GPU
1.92TB total
Optional 400GAir CoolingIn stock, immediate delivery
7 to 14 days after the 3rd unit is signed
$2.70 from
JP-Chiba-H100Japan Chiba - NVIDIA H1004 nodes
32 GPU
80GB per GPU
640GB per node
400G EthernetAir CoolingDelivery within 6 weeks of signing$2.21 from
CZ-B300-200Czechia - NVIDIA B30025 nodes
200 GPU
288GB per GPU
about 57.6TB total
On requestTo be confirmed16 weeks after signing$4.80 from
IN-B300India - NVIDIA B3008 to 256 nodes
Configurable
288GB per GPU
2.3TB per node
InfiniBand NDR 400GAir Cooling8 to 10 weeks after signing$4.86 from
US-B300United States - NVIDIA B3008 to 96 nodes
First batch 512 GPU
288GB per GPU
about 147TB total in first batch
InfiniBand NDR 400GAir Cooling10 to 14 weeks after signing$4.96 from
FI-B300Finland - NVIDIA B300144 nodes
1,152 GPU
288GB per GPU
2.3TB per node
800G ConnectX-8DLC liquid coolingAbout 22 weeks after signing$5.30 from
US-GB300-NVL72United States - NVIDIA GB30050 NVL72 racks
3,600 GPU
288GB per GPU
about 1,037TB total
InfiniBand XDR 800GDLC liquid coolingPOC 10 to 12 weeks after signing$5.30 from
KR-B300South Korea - NVIDIA B3008 nodes
64 GPU
288GB per GPU
about 18.4TB total
800G RoCEv2DLC liquid coolingLive in December 2026Contact for pricing
US-IOWA-B300United States Iowa - NVIDIA B30044 nodes
352 GPU
288GB per GPU
about 101.4TB total
800G ConnectX-8Air CoolingLive in mid-February 2027Contact for pricing
US-SEA-B300-32United States Seattle - NVIDIA B30032 nodes
256 GPU
288GB per GPU
about 73.7TB total
800G ConnectX-8Air CoolingLive in February 2027Contact for pricing
US-SEA-B300-64United States Seattle - NVIDIA B30064 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G ConnectX-8Air CoolingLive in mid-March 2027Contact for pricing
FAQ | Common questions

Common Questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

Plan the Next Stage of Compute Together

Where Efficiency Leads.
Where AI Defines the Future.