NVIDIA B300 - Czechia
CZ-B300-20016 weeks after signing
- Location
- Czechia
- Availability
- 16 weeks after signing
- Cooling
- To be confirmed
- Reference price
- $4.80 USD / hr / GPU, starting price - Monthly
Full Specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA B300
- GPU configuration
- 200 units8x B300 per node
- Deployment scale
- 25 nodes200 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Total cluster memory
- about 57.6TB total
FACILITYSite and Delivery
- Location
- Czechia
- Availability
- 16 weeks after signing
WORKLOADSuitable Workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16
From Signing to Go-Live
- 01Signing3 year term
- 02Handover16 weeks after signing
- 03Go-liveConfirmed with quote
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
Czechia
- Region
- Europe
- Country / city
- Czechia
- Site code
- CZ-B300-200
- Sites in the same location
- CZ-H200-NVL
Location is indicative, at country or city level.
Sites With NVIDIA B300
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| CZ-B300-200CzechiaThis page | 25 nodes 200 GPU | 288GB per GPU about 57.6TB total | On request | To be confirmed | 16 weeks after signing | $4.80 from |
| IN-B300India | 8 to 256 nodes Configurable | 288GB per GPU 2.3TB per node | InfiniBand NDR 400G | Air Cooling | 8 to 10 weeks after signing | $4.86 from |
| US-B300United States | 8 to 96 nodes First batch 512 GPU | 288GB per GPU about 147TB total in first batch | InfiniBand NDR 400G | Air Cooling | 10 to 14 weeks after signing | $4.96 from |
| FI-B300Finland | 144 nodes 1,152 GPU | 288GB per GPU 2.3TB per node | 800G ConnectX-8 | DLC liquid cooling | About 22 weeks after signing | $5.30 from |
| KR-B300South Korea | 8 nodes 64 GPU | 288GB per GPU about 18.4TB total | 800G RoCEv2 | DLC liquid cooling | Live in December 2026 | Contact for pricing |
| US-IOWA-B300United States Iowa | 44 nodes 352 GPU | 288GB per GPU about 101.4TB total | 800G ConnectX-8 | Air Cooling | Live in mid-February 2027 | Contact for pricing |
| US-SEA-B300-32United States Seattle | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G ConnectX-8 | Air Cooling | Live in February 2027 | Contact for pricing |
| US-SEA-B300-64United States Seattle | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G ConnectX-8 | Air Cooling | Live in mid-March 2027 | Contact for pricing |
Comparable Alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to Site SearchNVIDIA B300 - Finland
144 nodes · 1,152 GPU
About 22 weeks after signing$5.30 USD / hr / GPU, starting price
NVIDIA B300 - India
8 to 256 nodes · Configurable
8 to 10 weeks after signing$4.86 USD / hr / GPU, starting price
NVIDIA B300 - United States
8 to 96 nodes · First batch 512 GPU
10 to 14 weeks after signing$4.96 USD / hr / GPU, starting price
Common Questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Plan the Next Stage of Compute Together
Where Efficiency Leads.
Where AI Defines the Future.