NVIDIA B300 - South Korea
KR-B300Live in December 2026
- Location
- South Korea
- Availability
- Live in December 2026
- Cooling
- DLC liquid cooling
- Reference price
- Contact for pricing
Full Specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA B300
- GPU configuration
- 64 units8x NVIDIA B300 SXM (HGX B300) per node
- Deployment scale
- 8 nodes64 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Total cluster memory
- about 18.4TB total
HOSTHost
- Processor
- 2x AMD EPYC 9555 (64C/128T) per node
- System memory
- 2,304GB DDR5 per node
- Storage
- 8x 3.84TB NVMe (30.72TB) per node
NETWORKNetwork
- GPU interconnect
- Ethernet RoCEv2 800GbEnon-blocking 1:1
FACILITYSite and Delivery
- Location
- South Korea
- Cooling
- DLC liquid cooling
- Availability
- Live in December 2026
WORKLOADSuitable Workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-11-16
From Signing to Go-Live
- 01Signing5 year term
- 02HandoverConfirmed with quote
- 03Go-liveLive in December 2026
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
South Korea
- Region
- Asia
- Country / city
- South Korea
- Site code
- KR-B300
Location is indicative, at country or city level.
Sites With NVIDIA B300
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| KR-B300South KoreaThis page | 8 nodes 64 GPU | 288GB per GPU about 18.4TB total | 800G RoCEv2 | DLC liquid cooling | Live in December 2026 | Contact for pricing |
| CZ-B300-200Czechia | 25 nodes 200 GPU | 288GB per GPU about 57.6TB total | On request | To be confirmed | 16 weeks after signing | $4.80 from |
| IN-B300India | 8 to 256 nodes Configurable | 288GB per GPU 2.3TB per node | InfiniBand NDR 400G | Air Cooling | 8 to 10 weeks after signing | $4.86 from |
| US-B300United States | 8 to 96 nodes First batch 512 GPU | 288GB per GPU about 147TB total in first batch | InfiniBand NDR 400G | Air Cooling | 10 to 14 weeks after signing | $4.96 from |
| FI-B300Finland | 144 nodes 1,152 GPU | 288GB per GPU 2.3TB per node | 800G ConnectX-8 | DLC liquid cooling | About 22 weeks after signing | $5.30 from |
| US-IOWA-B300United States Iowa | 44 nodes 352 GPU | 288GB per GPU about 101.4TB total | 800G ConnectX-8 | Air Cooling | Live in mid-February 2027 | Contact for pricing |
| US-SEA-B300-32United States Seattle | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G ConnectX-8 | Air Cooling | Live in February 2027 | Contact for pricing |
| US-SEA-B300-64United States Seattle | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G ConnectX-8 | Air Cooling | Live in mid-March 2027 | Contact for pricing |
Comparable Alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to Site SearchNVIDIA B300 - India
8 to 256 nodes · Configurable
8 to 10 weeks after signing$4.86 USD / hr / GPU, starting price
NVIDIA B300 - Czechia
25 nodes · 200 GPU
16 weeks after signing$4.80 USD / hr / GPU, starting price
NVIDIA B300 - United States
8 to 96 nodes · First batch 512 GPU
10 to 14 weeks after signing$4.96 USD / hr / GPU, starting price
Common Questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Plan the Next Stage of Compute Together
Where Efficiency Leads.
Where AI Defines the Future.