KONST
AI Training CalculatorContact Us
EN
← Back to BlogBLOG | B300 · 2026-10-06

Where to Buy or Rent NVIDIA B300 and GB300: A Guide for Businesses in Taiwan

Compare B300 and GB300 purchases, bare-metal rental, dedicated clusters and GPU Cloud in Taiwan, including prices, delivery, deployment requirements, capacity and management responsibilities.

Where businesses in Taiwan can buy or rent NVIDIA B300 and GB300

Businesses can buy B300 or GB300 equipment through server manufacturers, authorized resellers or system integrators. For direct access to compute, they can approach providers about bare-metal rental or dedicated clusters. If ownership matters, compare the purchase and operating costs. If the priority is a working environment, compare reserved capacity, activation dates and management responsibilities.

B300 and GB300 Purchasing Channels and Rental Options

Businesses looking to buy or rent B300 or GB300 can contact KONST Group to discuss available options, deployment locations and delivery terms. Equipment ownership, management responsibilities and the expected usage period will help determine whether purchasing hardware, renting dedicated bare metal or using GPU Cloud is the best fit.

Access modelOwnership and managementCapacity commitmentLocation and best fit
Hardware purchaseCustomer owns the hardware, manages it or hires an operator, and bears replacement and residual-value risk.Capacity is fixed by the equipment purchased; expansion requires more hardware.On premises or in colocation; suits long-term use, asset control and teams able to manage operations.
Dedicated bare-metal rentalProvider usually owns the hardware. Customer has exclusive use; software is self-managed or managed by agreement.Often a fixed term with reserved capacity; idle capacity may still incur charges.Remote access at an agreed facility; suits sustained workloads needing control over the environment.
GPU CloudPlatform usually owns the hardware. Customer uses VMs, containers or other cloud resources; management varies by plan.On-demand or reserved capacity; on-demand access may not guarantee capacity at peak times.Available platform regions; suits short trials, variable demand or teams seeking preconfigured environments.

A dedicated GPU cluster combines multiple compute nodes and interconnect resources. It can be purchased or rented. For work spanning multiple servers, agree on node exclusivity, networking, storage and cluster-wide performance acceptance criteria as well as the commercial model.

Choosing Between B300 Servers and GB300 NVL72

B300 servers: Suitable for AI training and inference on a single server or across multiple nodes. Assess the GPU configuration, memory and cluster network against the model's requirements.

GB300 NVL72: Suitable for large-model workloads that need a high-speed, 72-GPU interconnect domain. Evaluate the rack-scale system, liquid cooling and power requirements together.

DGX B300 and GB300 NVL72 both use Blackwell Ultra GPUs, but differ in CPU architecture and the size of the GPU interconnect domain. B300 servers from other vendors should be checked against their specific configurations.

ComparisonB300 servers: DGX B300 exampleGB300 NVL72
System layoutEach server contains 8 B300 GPUs and can be combined with others in a cluster.Rack-scale system
CPU and GPU configurationPer server: x86 CPUs and 8 Blackwell Ultra GPUsPer rack-scale system: 36 Grace CPUs and 72 Blackwell Ultra GPUs
High-speed GPU interconnectEight-GPU NVLink within each server; a separate cluster network connects servers.A 72-GPU domain using fifth-generation NVLink
Deployment requirementsCheck power and cooling by model; published DGX B300 power consumption is approximately 14 kW per server.Plan rack-level liquid cooling, power distribution and cluster networking together.
Workload fitWork fits on one server or scales efficiently across nodes.Large models need a wider high-speed interconnect domain and sustained work at the appropriate scale.

Nine eight-GPU servers also provide 72 GPUs in total, but communication between those servers depends on the cluster network. That differs from the interconnect inside a single NVL72 system. Compare how the model is distributed, the volume of cross-node traffic and actual execution efficiency, as well as the GPU count.

Comparing B300 and GB300 Prices

As of October 2026, KONST's published B300 rental plans start at US$6 per GPU/hour. Applicable pricing varies by location, contract term, memory configuration and payment structure. Actual rates and included costs are governed by the final contract.

Compare B300 and GB300 prices using the same configuration, usage period and service scope. A GPU, an eight-GPU server, a rack-scale system and GPU/hour are different pricing units. Unit prices alone do not show which option has the lower total cost.

Hardware purchase: establish what the quote includes. Networking, storage, liquid cooling equipment, installation and warranty coverage all affect the upfront cost. Add facility, power, cooling, connectivity and operating expenses over time. If suitable infrastructure already exists, assess the additional costs of this deployment.

Bare-metal and cluster rental: confirm reserved capacity and minimum commitments. Check the term, minimum rental unit and expansion conditions alongside the GPU count. GPU/hour can be the pricing basis for a long-term contract; it does not necessarily mean pay-as-you-go billing. Reserved capacity may remain billable while idle.

GPU Cloud: check additional fees and capacity assurance. Storage, data transfer and idle resources may incur separate charges. On-demand access to a particular model depends on region and current capacity. A fixed launch date may require a reservation.

Delivery and Deployment Determine When Compute Is Usable

Plan around the date workloads can run reliably. Hardware purchases require site readiness, installation and software validation. Rental services require confirmed capacity, working account access and acceptance of the delivered environment.

Before ordering equipment, confirm that power, cooling, space and networking support the selected model. Delivered hardware cannot go live while power distribution or liquid cooling work remains unfinished. Clarify warranty commencement, installation and acceptance dates together.

For bare-metal or cluster rental, distinguish a quotation from reserved capacity and a production-ready service. Align activation, billing commencement and acceptance conditions in the contract, including how delivery delays will be handled. Future expansion also requires confirmation of capacity lead times and interconnect compatibility.

A service contact in Taiwan does not establish that equipment and data are also in Taiwan. Confirm the locations of compute, primary storage and backups, as well as cross-border latency, transfer fees and support hours, against the project's requirements.

Global B300 Plans: Scale and Deployment Status

As of October 2026, KONST's global compute page lists 13 B300 plans, including plans of different sizes in the same city. These are not 13 separate cities or a statement of real-time rental inventory. The following summary is based on publicly available website information. Plans without a specific go-live date require confirmation, and actual delivery dates are governed by the contract.

  • Cyberjaya, Malaysia: 1,024 GPUs across 128 production nodes, expected to go live in March 2027.

  • New Taipei, Taiwan: 32 GPUs across 4 nodes, open for reservation; go-live date to be confirmed.

  • Sydney, Australia: 512 GPUs, expected to go live in November 2026.

  • California, United States: Two plans with 256 GPUs and 512 GPUs, expected to go live by mid-December 2026.

  • Houston, United States: 512 GPUs, expected delivery in February 2027; go-live date to be confirmed separately.

  • Toronto, Canada: Two plans with 512 GPUs and 1,120 GPUs; contact the provider for go-live dates.

  • Poland: 1,024 GPUs, expected to go live in phases from January 2027.

  • Spain: 1,024 GPUs; contact the provider for the go-live date.

  • Paris, France: 400 GPUs; contact the provider for the go-live date.

  • Czech Republic: 512 GPUs; contact the provider for the go-live date.

  • Europe plan: 1,152 GPUs; confirm the go-live date and specific deployment location when requesting a quotation.

See KONST Global Compute for the full plans. The Cyberjaya go-live month follows the Malaysia Cyberjaya project page. These figures are the capacities of published plans; the quantity available for reservation must still be confirmed.

Validating Performance Before Buying or Signing a Long-Term Rental

Test candidate configurations with your own models and data before committing. Under the same quality requirements, establish how many GPUs are needed, how long work takes and whether the total cost meets expectations. Peak compute and network specifications help with initial screening; real workload results should guide the final decision.

  • Large-scale training: Fix the model, data and training settings, then compare time to the target quality, GPU count and execution stability.

  • Multi-node workloads: Measure the speedup from adding nodes and identify bottlenecks in communication, data access or storage, beyond nominal port speeds.

  • Online inference: Fix the model, input and output lengths, concurrency and cache conditions. Compare completed requests that meet latency and quality targets.

Turn the results into measurable acceptance criteria in the delivery scope. If a small rental trial is followed by a multi-node deployment, retest networking and storage at the larger scale. Single-server results do not necessarily scale in direct proportion to the number of servers.

KONST B300 Bare-Metal and Dedicated Cluster Services

KONST offers B300 through its GPU bare-metal rental service, alongside dedicated GPU cluster delivery. These options suit businesses needing reserved capacity, control over their software environment or multi-node computing. Model size, sustained usage and deployment requirements help determine whether a single bare-metal server or a dedicated cluster is appropriate.

Delivery includes server installation, initial operating system setup, drivers and the base environment, plus an isolated network segment and dedicated VPN. KONST owns the hardware; customers connect remotely and manage their frameworks, scheduling and data. Multi-node projects can include agreed networking, storage, performance acceptance and operating responsibilities in the cluster plan.

The service reserves capacity under annual contracts, uses GPU/hour as its pricing basis and is billed monthly. Payment and capacity terms are defined in the contract. It suits teams with sustained compute needs that want to retain software control while the provider delivers the hardware and initial environment.

Discuss B300 bare-metal and dedicated cluster requirements with KONST to confirm a delivery plan that fits your project timeline and usage scale.

B300 and GB300 Rental FAQ

Where Can Businesses Rent B300 in Taiwan?

Contact KONST about its New Taipei B300 bare-metal plan, and check the service page for specific availability and pricing. If data must remain in Taiwan, confirm the locations of equipment, storage and backups in the contract. Available GB300 options require a separate quotation.

How Much Does B300 Cost per Hour?

As of October 2026, KONST's published B300 plans start at US$6 per GPU/hour. This is a reference pricing unit for a long-term capacity service. It does not mean that customers can rent for just one hour or pay only for the hours spent actively computing. GB300 pricing requires a separate quotation.

What Is the Minimum B300 Rental Term?

The published New Taipei plan lists three-year and five-year contracts, so the shortest term currently listed is three years. Shorter terms may be negotiated separately depending on scale and conditions. Confirm the terms of plans at other locations individually.

Further Reading

B300GB300GPUBare MetalGPU Cloud

Plan the Next Stage of Compute Together

Where Efficiency Leads.
Where AI Defines the Future.