Data Center Build and Operations Costs

Construction has no standard list price because no two data centers are alike. The cost structure is consistent, however. This page explains what each line item in a proposal pays for.

Four parts of the construction budget

01

Site infrastructure

Structural work, architectural finishes, water and drainage, and site works. Renovating an existing building has a very different cost structure from new construction.

  • Foundation work and structural steel
  • Exterior and interior finishes and fixtures
  • Water, drainage, and sanitary systems
  • External works and temporary works
02

Electrical systems and redundancy

Incoming power equipment, feeders, downstream distribution to rack power, generators, and uninterruptible power systems.

  • Incoming power equipment and feeder cables
  • PDUs and distribution panels on each floor
  • Large generators
  • UPS systems
03

Cooling and racks

Cooling design is the largest variable. Air-cooled, liquid-cooled, and hybrid systems require different piping, power distribution, and rack layouts.

  • In-row cooling
  • Air-cooled chillers and chilled-water pumps
  • IT racks and aisle containment
  • Clean-agent fire suppression
04

Monitoring and environmental controls

The monitoring platform, very early smoke detection, sensors, CCTV, and access control form the basis for acceptance and ongoing operations.

  • Environmental monitoring and graphical control software
  • Very early smoke detection
  • Digital power meters and PUE measurement
  • CCTV and access control

Why construction has no list price

The same 1 MW deployment can cost several times more in a thirty-year-old factory than on a greenfield site. Cost depends on whether existing power capacity is sufficient, whether the floor can carry the load, where water and drainage are available, and how long local permitting takes.

We begin with an on-site assessment and airflow simulation, then issue an itemized proposal once those variables have been quantified. This usually takes two to four weeks and establishes the basis for every estimate that follows.

Operations are more standardized. Data center technical maintenance uses annual contracts billed monthly. The 24×7 remote support covers firewalls, switches, servers, storage, and mechanical and electrical systems, with defined response times from incident reporting. Emergency on-site work is priced by weekday or holiday and business or non-business hours.

How operations are priced

Annual contract, billed monthly

Data center technical maintenance

The core operations contract covers routine inspections, preventive maintenance, consumable replacement, and weekly service records.

  • Quarterly or annual contract
  • Billed monthly
  • Weekly service records
Included in contract

24×7 remote support

Covers firewalls, switches, servers, storage, and mechanical and electrical systems, with defined response times from incident reporting.

  • Incident reporting at all hours
  • Remote diagnosis and resolution
  • Integration with equipment manufacturers' service systems
Priced per call

Emergency on-site support

Four rate bands cover weekdays or holidays and business or non-business hours. The first hour and additional hours are billed separately.

  • Four time-based rates
  • Separate rates for the first and additional hours
  • Per-unit surcharge for additional equipment

Four stages from assessment to proposal

1

Collect requirements and site data

1 week

Target compute scale, delivery schedule, existing power and structural conditions, and local regulations and permits.

2

Assess the site and simulate airflow

2 to 4 weeks

Use CFD thermal simulation to validate the cooling design while confirming power capacity and floor loading.

3

Design the solution and itemize costs

Produce design drawings, an equipment list, and itemized pricing, identifying which elements are custom and which can be standardized.

4

Build and accept

Payments follow project milestones. Before handover, we run full-load stress tests and an operational readiness review. After acceptance, the project moves to an operations contract.

Need a budget estimate for data center construction and operations?

Tell us about the site and planned scale, and we will help identify the construction and operating costs.