AI Data Centers: Core Infrastructure Built for the Intelligent Era

In the AI era, computing power is competitiveness. KONST provides end-to-end AI data center construction and operation services, from design, construction, deployment to maintenance, with our in-house team handling the entire process, reducing construction time by 30-40% and lowering total costs, helping enterprises rapidly deploy high-performance computing platforms.

Loading map...

0 MW

Operational & Under Construction

0.00

Average PUE

36 MONTHS

Fastest Delivery Timeline

AI Data Center Infrastructure

24/7 real-time technical support throughout the year

The results

  • 10× Faster Training: AI model training runs up to 10× faster than on traditional infrastructure.

  • 50% Energy Savings: Advanced power and environmental management deliver industry-leading PUE < 1.2.

  • 99.99% Uptime: Redundant power and networking ensure continuous availability.

  • Seamless Scaling: Effortlessly scale from prototype to full production workloads.

The solutions

  • Challenge

    Traditional data centers cannot efficiently handle the massive computational requirements and power demands of modern AI workloads, leading to bottlenecks and inefficiencies.

  • KONST Solution

    • GPU-Optimized Clusters: NVIDIA A100, H100, H200, and more, built for distributed AI training.
    • Efficient Power & Cooling Management: Optimized infrastructure achieves PUE < 1.2.
    • AI-Optimized Networking: Ultra-low latency InfiniBand backbone for large-scale training.
    • Glows.ai Cloud Platform: Flexible, transparent, and on-demand compute with auto-deployment, autoscaling, and per-second billing.

KONST AI Data Centers — More than Infrastructure, the AI Power Engine Driving Industry Transformation

Rapid Delivery, Global Deployment

  • Fastest 4-6 month completion: Self-built integrated construction process, no outsourcing required, industry-leading efficiency.
  • Cross-regional presence: Taiwan, Japan, Europe, USA, Southeast Asia, forming a multi-node computing network to meet multinational needs.

High Performance and Flexible Architecture

  • Tier 1-3 grade facilities, PUE < 1.2, exceeding industry average
  • 20KW high-density racks, supporting large-scale AI training and inference
  • Hybrid cloud/private cloud flexible architecture, balancing performance and compliance

Security and Compliance

  • ISO 27001 implementation, comprehensive data security protection
  • Supporting finance, healthcare, government institutions and other high-sensitivity industries

Key Features

  • Specialization: Purpose-built for AI & Machine Learning workloads
  • Global Network: Multi-node presence across Taiwan, Japan, Europe, the US, and Southeast Asia
  • GPU Capacity: 100,000+ GPUs for large-scale distributed training
  • Power Efficiency: Industry-leading PUE < 1.2
  • Connectivity: Ultra-low latency backbone networking for peak performance

KONST AI Data Centers are more than just infrastructure — they are the foundation for the next generation of AI breakthroughs. Partner with us to accelerate your AI journey and unlock the full potential of your data and algorithms.